Topology, scaling, and upgrades
Lunar Orbit · Planned
You will be able to: explain why a Pod can stay Pending while other zones have spare CPU, and trace a scaling request from metric to working capacity.
In kind, every worker is on one machine. A cloud region has several availability zones, separate data centres that fail independently. That sounds strictly better, but it adds constraints: data and compute must be in the same place, and capacity added in one layer may be useless without the next.
Zones constrain where things can run
A restaurant with several branches: if the kitchen's freezer (your data) is in branch A, the chef (your Pod) must work in branch A, even if branch B is empty. Hiring more chefs does not help if there is no kitchen space to put them.
A Pod and its volume must meet
A zonal block disk exists in one zone and can attach only to nodes there. If identity-db-0's disk is in zone A and zone A fails, the replacement cannot start in zone B because the disk cannot follow. The Pod stays Pending although zone B has free CPU. (This is the cloud twin of kind's local-path pinning.)
WaitForFirstConsumer helps the scheduler and the provisioner choose a compatible zone the first time. It does not make a zonal disk multi-zone.
Pod scaling versus node scaling
Two different shortages need two different tools:
| Layer | Adds | Cannot fix |
|---|---|---|
| HPA | Pods, based on metrics | No node room; a non-CPU bottleneck |
| Cluster / node autoscaler | Nodes, for Pods that are unschedulable | A missing metric; impossible affinity, quota or zone constraints; whether more replicas actually help |
Trace a scale-out end to end: a metric rises → the HPA raises the desired replicas → Pods are created → the scheduler places them or reports why it cannot → if they are Pending, a node autoscaler may add a node → the scheduler retries → readiness → a passenger request succeeds.
Upgrades are compatibility checks
A managed control-plane upgrade is only one part. Nodes, network and storage plugins, the Gateway controller, observability components and workloads all have version and disruption constraints. Before upgrading:
- Establish supported version skew and add-on compatibility.
- Keep enough capacity so draining a node leaves room.
- Use PDBs so drains do not remove too much at once.
- Watch real passenger requests during the change.
A successful provider API call does not show that booking stayed useful.
Evidence
- Topology: scheduling events, node zone labels, claim binding and volume location, read together.
- Scaling: separate desired, created, scheduled and ready Pods.
- No provider topology or upgrade procedure is verified for Apollo.
Common misconceptions
- "More zones means automatically more resilient." Zonal volumes pin data.
- "The HPA adds capacity." It adds Pod objects; capacity comes from nodes.
- "An upgrade is one click." It is a chain of compatibility checks.
Check yourself
HPA wants 8 replicas, only 5 run. Where do you look?
Pending Pods' events (Insufficient cpu, affinity, volume), node capacity, and whether a node autoscaler exists and is eligible to act.
Where this leads
Failures will happen. The last chapter covers preparing for them with backups, and leaving no mess when you tear down.